top of page
307383638_7971263746277240_2595730862406306053_n.jpg

Projects

Gallant creek flood conveyance
District of north vancouver 
$5m lump sum contract

  • Installation of approximately 160m of concrete storm sewer (180mm to 2100mm nom. dia.; bends, manholes, tie-ins)

  • Installation of cast-in-place inlet and outlet headwalls

  • Improvements to inlet and outlet creek channels

  • Daylighting of a section of creek at the outlet

  • Relocation of approximately 150 of water main

  • Approximately 120m of sanitary sewer Relocations

Gallant Creek Flood Conveyance (1).avif

lynn valley residences - offsite civil
District of north vancouver
$6M lump sum contract

  • Earthworks, subgrade, fill and paving for three new roads within the development area

  • Installation of below grade utilities

  • Road and sewer upgrades to existing Mountain Highway, Lynn Valley Road, and East 27th Street

  • Managing subcontractors and coordination of commercial and residential traffic

IMG_0155.JPG

TransEd Valley line lrt
ellis don / city of edmonton
$15.3m lump sum contract

  • Installation of 13km of new track drainage and removal of associated contaminants

  • Earthworks volumes amounted to 200,000MT+ of contaminated soil\GMB auger for tunnelling 220LM and later utility installation

  • Launching and receiving pit for GMB auger was 12m deep using a slide rail shoring system

TransEd Valley Line LRT.avif

bonnybrook wwtp
graham construction / city of calgary

$25M+ lump sum contract

  • Installation of 750LM of 3m x 3m box culverts

  • Installation of 1850mm and 1650mm concrete pipe with associated excavation tie in's and backfill

  • Installation of 5M diameter intake structure

  • Installation of 2-5M manoles​

​​​​​

Bonnybrook WWTP.jpeg

city of edmonton opencut package
city of edmonton

$3M Lump sum contract

  • Remove and replace 400 locations within a 4-block residential neighborhood

  • Compromising of service repairs, CB leads, MH install, se4rvice installation, curbs, sidewalks and paving

City of Edmonton OpenCut Package.png

killarney neighbourhood renewal
city of edmonton

$2M lump sum contract

  • Remove and replace 200 locations within a 5 block residential neighbourhood.  Composed of service repairs, CB leads, MH install

  • Service installation, curbs, sidewalks, and paving

  • ​

Killarney Neighbourhood Renewal.jpg

cameron bay forcemain
city of kenora

$6M lump sum contract

  • Blasting high volume Canadian shield rock

  • Installation of turbidity curtains

  • Excavation of 4M within lake of the woods using barges and placing 150LM of 12" HDPE pipe within lake floor

Cameron Bay Forcemain.webp

clayburn substation
BC Hydro / forbes
$7.5M lump sum contract

  • All site preparation

  • Civil, electrical conduit and the installation of 8 to `6 way duct bands to further decommission existing 225KV overhead substation

  • Expansion of the substation yard and pile, supported concrete foundations in preparation of upgrade and install of the new 225KV

Clayburn Substation.jpg

Maple wood lands site remediation
district of north vancouver
$7.2M lump sum contract

  • 7 acre tree clearing, sorting & chipping

  • Site grubbing and wood debris sorting

  • 200,000MT contaminated soils remediation and creation of associated ESC plan

  • Mass excavation & disposal of reuse soils

  • Invasive species removal and remediation

  • Prepare rough grade

maplewoods Land Site Remediation.jpg

Emery Place residences - offsite civil
Mosaic homes / district of north vancouver

$5.2M lump sum contract

  • Earthworks, subgrade fill and paving for two new roads within the development area

  • Installation of below grade utilities

  • Road and sewer upgrades to existing Mountain Highway

  • Managing subcontractors and coordination of commercial and residential traffic

​

IMG_1471.JPG

tawa dry pond and conveyance
city of edmonton
$10m lump sum contract

  • Excavation of 484,000mt to create a dry pond part of a 70-year flood mitigation plan

  • Installed 200LM of 2400mm concrete storm line

  • Excavation of trenches were 10m deep and involved removal of contaminated soil

  • ​

Tawa Dry Pond & Conveyance.jpg

epcor 28 avenue drainage
city of edmonton

$12.8M Lump sum contract

  • installation of 450LM of 2400mm concrete storm line

  • Excavation and trenching 9m deep using sheet pile shoring

  • Completed associated tie-ins and precast structure installation

​

​

​

EPCOR 28 Avenue Drainage.jpg

millcreek cds units
city of edmonton

$2.2M Lump sum contract

  • Installation of two dual CDS intake structures

  • Excavation 14m deep using sheet pile shoring 

  • Installation of precast manholes, catch basins, PVC, water line and PVC storm line with all associated tie-in's to existing

Mill Creek CDS Units.jpg

cn highfield
cn rail / city of calgary

$5.25M lump sum contract

  • Installation of 1950mm and 1650mm concrete pipe associated with excavation, tie-in's and back fill

  • Installation of 495LM of 82" HDPE Pipe using GBM auger

  • Associated track and road works

CN Highfield.webp

pickle lake airport
Mishkeegogamang ojibway first nation
$4.2M lump sum contract

  • Remove and dispose of existing runways located in small First Nations communities

  • Excavation and complete build of new runway and associated drainage

  • Placed 1500 m2 of new concrete and asphalt 

Pickle Lake Airport.jpg
  • Instagram
  • Facebook
  • YouTube

Heavy Underground Consulting Ltd. 2025

bottom of page